Approvals across Dubai & the UAE
+971 50 224 6900 info@dubaifitoutapproval.com Sat – Thu: 9:00 AM – 6:00 PM

LPG Gas Approval

LPG Gas Installation Approval — DCD & Authorised Suppliers

Gas system design, supplier coordination, Civil Defence gas NOC, pressure testing and commissioning for commercial kitchens and gas-fired installations.

What LPG approval covers

Any commercial kitchen or gas-fired installation in Dubai requires a dedicated gas approval, reviewed by Civil Defence and executed through an authorised gas supplier. It is a distinct process from the main DCD fit-out NOC and is frequently the last item to complete on a restaurant project — which is precisely why it should be started first.

What the process involves

  • Gas load calculation based on the equipment schedule
  • Pipework routing design and material specification
  • Ventilation and gas detection system design
  • Emergency shut-off valve positioning
  • Coordination with an authorised gas supplier
  • Civil Defence gas NOC submission
  • Pressure testing, inspection and commissioning

Typical timeline

Design approval takes 7 to 14 working days. Supplier coordination, installation, testing and commissioning add further time, and the sequence is unavoidably serial — each stage depends on the one before it.

Start with the equipment schedule

The gas load calculation depends entirely on the kitchen equipment schedule. Restaurants that finalise their equipment late, or change it after the gas design is approved, trigger a full redesign and resubmission. Locking the schedule early is the single most useful thing an operator can do to protect the opening date.

Need an approval moving this week?

Send us your drawings and location. We will confirm the authority route, the documents required and a realistic timeline — at no cost.

Request a Quote WhatsApp Us