LPG Gas Approval

Gas line design, supplier coordination, DCD gas NOC and commissioning for commercial kitchens and gas-fired equipment.

What this covers

Every commercial kitchen and gas-fired installation in Dubai needs a dedicated gas approval, reviewed by Civil Defence and executed through an authorised gas supplier. This is a separate process from the main DCD fit-out NOC.

What the process involves

  • Gas load calculation based on your equipment schedule
  • Pipework routing design and material specification
  • Ventilation and gas detection system design
  • Emergency shut-off valve positioning
  • Coordination with an authorised gas supplier
  • Civil Defence gas NOC submission
  • Pressure testing, inspection and commissioning

Start this first, not last

Gas approval is routinely the final item on a restaurant project and routinely the reason opening dates slip. The stages are unavoidably serial — design, approval, installation, testing, commissioning — and each depends on the one before. The gas load calculation depends entirely on the kitchen equipment schedule, so operators who finalise equipment late trigger a full redesign. Lock the schedule early and this becomes a non-event.

What you receive

  • Gas load calculation from the equipment schedule
  • Pipework routing and material specification
  • Ventilation and gas detection design
  • Emergency shut-off valve positioning
  • DCD gas NOC submission
  • Pressure testing and commissioning support
Related

Other services

DEWA Approval & Connection

Load calculations, single-line diagrams, meter applications and energisation — handled in parallel with your main permit.

Need an approval moving this week?

Send us your drawings and location. We will confirm the authority route, the documents required and a realistic timeline — at no cost.